<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Marble Plumbing</title>
	<atom:link href="http://www.marbleplumbing.co.uk/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.marbleplumbing.co.uk</link>
	<description>Just another Platform Blogs weblog</description>
	<lastBuildDate>Fri, 30 Jul 2010 11:16:15 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0</generator>
		<item>
		<title>New Boiler Installed &#8211; Loft Conversion</title>
		<link>http://www.marbleplumbing.co.uk/2010/07/30/new-boiler-installed-loft-conversion/</link>
		<comments>http://www.marbleplumbing.co.uk/2010/07/30/new-boiler-installed-loft-conversion/#comments</comments>
		<pubDate>Fri, 30 Jul 2010 10:53:06 +0000</pubDate>
		<dc:creator>Annie</dc:creator>
				<category><![CDATA[Case Studies]]></category>

		<guid isPermaLink="false">http://wordpress.fubra.com/marbleplumbing/?p=86</guid>
		<description><![CDATA[Marble Plumbing was called to a job in Kingston, the customer was going to have a loft conversion done and wanted to get rid of the loft tanks [...]]]></description>
			<content:encoded><![CDATA[<p class="first">Marble Plumbing was called to a job in Kingston, the customer was going to have a loft conversion done and wanted to get rid of the loft tanks to make it into beautiful loft they have always dreamed of, but thought the tanks would spoil the image.</p>
<p>We had a chat for an hour or so, about the different types of heating systems available to suit her dwelling. In the end, after completing the correct flow rate and pressure tests, we both decided that a Worcester Bosch system boiler and a 210 litre unvented cylinder would be the best solution. It would give the house enough kilowatts per hour for the heating, and would be able to heat up a suitable quantity of water in an adequate time.</p>
<p>I then left the property most importantly, with a good relationship with the customer. She was left knowing exactly what was going to be installed and how it was going to work.</p>
<p>Once the estimate was complete and sent off to the customer, Marble Plumbing and Marble Construction worked together to sort out the best date for the installation, fitting around the loft conversion schedule. With the dates agreed, and the customer happy for the go ahead, Marble Plumbing started the installations.</p>
<p>The project took approximately 3 days to complete and the customer was extremely happy with the workmanship and the quality of the installation.</p>
<p>Once everything was tested and commissioned all the paperwork was filled out and the customer was shown by the installer what everything was, and how it all worked.</p>
<p>Marble Plumbing was also asked to complete the refurbishment of the two bathrooms in the house, and also completed the heating in the loft. Below are some images of the finished loft conversion and bathrooms. </p>
<p>The customer has also asked us back to complete more work on the property in the near future.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.marbleplumbing.co.uk/2010/07/30/new-boiler-installed-loft-conversion/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>New Website Launched</title>
		<link>http://www.marbleplumbing.co.uk/2009/12/17/new-website-launched/</link>
		<comments>http://www.marbleplumbing.co.uk/2009/12/17/new-website-launched/#comments</comments>
		<pubDate>Thu, 17 Dec 2009 14:41:50 +0000</pubDate>
		<dc:creator>Andy</dc:creator>
				<category><![CDATA[Case Studies]]></category>
		<category><![CDATA[Uncategorized]]></category>

		<guid isPermaLink="false"></guid>
		<description><![CDATA[Today we are happy to announce that our new website has been launched. It&#8217;s currently under construction, so keep checking back here for updates as we get the [...]]]></description>
			<content:encoded><![CDATA[<p class="first">Today we are happy to announce that our new website has been launched. It&#8217;s currently under construction, so keep checking back here for updates as we get the content updated over the Christmas Holidays.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.marbleplumbing.co.uk/2009/12/17/new-website-launched/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
